Discover the Key Facts
Design Description

Product Specifications
Roof Type
Flat roof (FR)
How to Install the Structure on the Roof
Ballast structure (B)
Type of structure
Design (PS)
Module Orientation
East-West (EW)
Module Layout
Level (H)
PV1 Module Installation Instructions
Short side (SA)
Application/surface on which it is installed
PVC membrane/bituminous membrane
How to Assemble the Structure
The structural base is placed on the roof deck and then further weighted down with concrete blocks placed on the ballast platform
Does the design require additional ballast?
Yes
Is it possible to use a hybrid solution (welding + ballast)?
No
Approximate weight of the structure per 1 m² of installation without additional ballast (kg/m²)2
~13,5
Purlin Length (mm)
X
Length of the wind vane (mm)
Without a windshield
Maximum length of a PV module (mm)³
X
How to Install Clamps
Clamps mounted on the triangle
Distribution Method
Custom design made to order with a lead time of up to 4 weeks for modules with the length specified in the product sheet sent for a quote
Structural Base Components




Other Mounting Components














